Donor: EU – IPA
Budget: 785,000 €
Project Description:
The overall objective of this project is to supervise the works contract with the aim to assist EPS to obtain an integrated permit (under IPPC Law) for further operation of thermal power plants and for their performance of activities after the year 2015. Moreover, the aim of this project is to align emissions and introduce the best available techniques (BAT) for water emission reduction. The project will be located in Obrenovac, at Nikola Tesla B Power Plant, in Serbia.
The project consists of:
- Technical Assistance throughout tender evaluation procedure;
- Supervision of work activities performed in accordance with FIDIC Conditions of Contract (Plant and Design-Build Conditions, Yellow Book), Physical Planning and Construction Act (Official Gazette 72/09 and 24/11), and other relevant Serbian Legislation;
- Check Contractor’s design, drawings and Bills of Quantities;
- Efficient administration of the Project according to FIDIC;
- Daily supervision of construction works;
- Overall quality control;
- Financial control in accordance with contract documents and ‘best practice’;
- Review of time scheduling and assuring completion of the works contract within estimated budget;
- Review of Contractor’s Quality Assurance Plan;
- Supervision of preparation of detailed design;
- Establishment and assistance in QA/QC procedures through certification of acceptance testing;
- Liaison and coordination between all parties involved in the project;
- Project Management.