Donor: BUSKI (Bursa Municipality)
Budget: € 495,000
Project Description:
The purpose of this project was to supervise the implementation of the SCADA, a system established, which has two servers configured in redundancy, based centralized management system at a location determined by BUSKI. The system monitors and controls potable water production, purification, collection and distribution stations/networks, which are located in a large geographical area within the borders of the city of Bursa, where BUSKI is responsible for operation and maintenance.
The project consists of 5 sub projects:
- Waster water treatment plant works;
- Storm & Wastewater drainage works;
- Water supply works;
- Consultancy and supervisory services;
- Other works
Activities carried out within the project included:
- Supervision of the Project’s execution under engineer’s concept according to FIDIC (Yellow book);
- Supervision, revision and approval of the detail engineering prepared by the SCADA Contractor;
- Assistance to the Beneficiary during the development and installation of the project (SCADA System);
- Supervision of the design and implementation of the Control Centre;
- FAT and SAT test of the whole equipment and of the SCADA System (software and hardware); and
- Final acceptance of the system in operation.