Donor: INTERBIAK S.A.
Budget: € 7,113,207

Project Description:

The main objective of the project was to implement full project management services during the construction of two sections of the A8 highway in Northern Spain.

Specific objectives of the project were the following:

  • Integrated management organisation: Design and implementation of an integrated management system; create a specific management information system for the program; detailed design and preparation of tender dossier; preparation of ToR, assistance to elaborate contractual documents and preparation of all the informativwe sessions with the potential tenderers;
  • Technical assistance for project and researches: Supervision of technical and documental quality of projects and researches; follow-up of the environmental impact research;
  • Supervision during works of construction: quality control of works and installations.

Types of services provided within the project included:

  • Detailed design and preparation of the full Tender Dossier for Construction works following similar to FIDIC conditions of contract;
  • Assistance in the Tender Evaluation and Contracting;
  • Construction Supervision.