Donor: SIAC/Ferrovial
Budget: 423,000,000 USD (Eptisa’s share 3,525,000 USD)
Project Description:
The existing National Primary N3 Dublin to Cavan road is one of the principal routes linking Dublin to the north-west. This route is currently dual carriageway to the Clonee Bypass, then passes through the centrel of Dunshaughlin to the Navan Inner Relief Route and on through the centre of Kells. The new M3 motorway will have a total scheme length of about 60 km and the project will cover approx. 700 hectares of land. The scheme includes 60 km of mainline and 50 km of ancillary and access roads.
Type of services provided:
- Structure design and specifications;
- Road design and specifications;
- Design team management including supervision and quality control of final specifications and drawings;
- Laboratory analysis and material quality control Project reporting.