Donor: Spanish Government
Budget: € 330,000
Project Description:
The overall objective of the project was to prepare Feasibility Study and Detailed Engineering Design for water supply and wastewater collection and treatment systems for thirty villages in Romania, located in five counties: Buzau, Covansa, Salaj, Suceava and Teleorman.
The types of services provided throughout the project included:
- Project Management;
- Feasibility Study;
- Preliminary design review and engineering;
- Topographic and geophysical studies;
- Environmental impact assessment;
- Financial and economic analysis;
- Detailed engineering design.