Donor: ADIF – Spanish HSR Procurement Agency
Budget: € 900,000 (Investment: € 50 mill)
Project Description:
The project included the detailed design comprising the infrastructure of teh new high speed rail line, between Cheste and Aldaya municipalities, both located inthe Valencia province.
Specific objectives of the project included conceptual design, detailed design and site supervision for the above mentioned section.
Description of services
- Alignment alternatives study based on Preliminary Design;
- Conceptual Design of the best solution based on technical, economical and environmental criteria;
- Detailed design of the infrastructures.