Donor: Dragadosvias JV
Budget: 684,952 €
Project Description:
This feasibility study and detail design project of the High Speed Rail Line Madrid – Galicia, included the following activities:
- Alignment alternatives study based on Preliminary Design;
- Feasibility study of proposed alternatives, economic and financial evaluation, comparison and Cost Benefit Analysis;
- Conceptual Design of the best solution based on technical, economical and environmental criteria;
- Detailed design of the infrastructure;
- Support to the works direction regarding design changes from the basic design;
- Assistance on specific solutions in critical conceptions of the design.