Donor: GIF
Budget: € 1,505,376 (Construction: € 37,955,903)

Project Description:

The project included technical assistance for works supervision and control at a high speed railway construction, section: Guadalcazar – Fuente Palmera.

The services included:

  • Technical assistance to the works direction, inspection and works supervision;
  • Geometric and quantitative control;
  • Qualitative control and quality controls supervision.