Donor: GIF
Budget: € 1,505,376 (Construction: € 37,955,903)
Project Description:
The project included technical assistance for works supervision and control at a high speed railway construction, section: Guadalcazar – Fuente Palmera.
The services included:
- Technical assistance to the works direction, inspection and works supervision;
- Geometric and quantitative control;
- Qualitative control and quality controls supervision.