Donor: Ministry of Environment
Budget: € 1,830,820
Project Description:
The project objectives included water conduction for water supply to 58 population nucleus in La Mancha plain and water regeneration of sites of environmental interest; drinking treatment plan scheme. The scope of the works comprised the basin of high Guadiana with an extension of 12,000km2.
Activities conducted within the project included:
- Water resources and primary demands;
- Study of several points for water collection;
- General planning of infrastructures in three phases;
- Drinking treatment plan design and scheme;
- Previous geological-geotechnical study.