Donor: EIB&BUSKI
Budget: € 465,664

Project Description:

The purpose of this project was to design and to determine the implementation conditions of the SCADA, a system established, which has a computer based centralized management system at a location determined by BUSKI to monitor and control potable water production, purification, collection and distribution stations/networks which are located in a large geographical area within the borders of the city of BUSKI is responsible for operation and maintenance.

The project consisted of 5 sub projects:

  • Waste water treatment plant works;
  • Storm & Wastewater drainage works;
  • Water supply works;
  • Consultancy services;
  • Other works

Activities conducted within the project included:

  • Project Management;
  • Collection of Information, Present Status Study and Assessment Report;
  • Preparation of Conceptual/Preliminary Designs;
  • Preparation of Tender Dossier under FIDIC;
  • Assistance to the Beneficiary during Tender Stage;
  • Documentation, digital maps, reports and other required data.