Donor: EIB&BUSKI
Budget: € 465,664
Project Description:
The purpose of this project was to design and to determine the implementation conditions of the SCADA, a system established, which has a computer based centralized management system at a location determined by BUSKI to monitor and control potable water production, purification, collection and distribution stations/networks which are located in a large geographical area within the borders of the city of BUSKI is responsible for operation and maintenance.
The project consisted of 5 sub projects:
- Waste water treatment plant works;
- Storm & Wastewater drainage works;
- Water supply works;
- Consultancy services;
- Other works
Activities conducted within the project included:
- Project Management;
- Collection of Information, Present Status Study and Assessment Report;
- Preparation of Conceptual/Preliminary Designs;
- Preparation of Tender Dossier under FIDIC;
- Assistance to the Beneficiary during Tender Stage;
- Documentation, digital maps, reports and other required data.